Baiada Project

Client: Batter Enterprises

Location: Hanwood

Contract Type: Lump Sum

Value: $2.5 Million

  • Construct main factory waste water pump station with 3 gorman rupp positive displacement pumps
  • Above ground pipe work manifold complete with pig launchers
  • 4.2km of 450mm HDPE PN12-5 poly pipe line for raw water feed to factory
  • 3 x 2.7km 315mm HPPE PN9 poly pipe line for waste discharge from factory to treatment works
  • 2.7km 315mm HDPE PN9 poly pipe line for gas from treatment works to factory site for use with generation of power