Baiada Project
Client: Batter Enterprises
Location: Hanwood
Contract Type: Lump Sum
Value: $2.5 Million
- Construct main factory waste water pump station with 3 gorman rupp positive displacement pumps
- Above ground pipe work manifold complete with pig launchers
- 4.2km of 450mm HDPE PN12-5 poly pipe line for raw water feed to factory
- 3 x 2.7km 315mm HPPE PN9 poly pipe line for waste discharge from factory to treatment works
- 2.7km 315mm HDPE PN9 poly pipe line for gas from treatment works to factory site for use with generation of power